Before You Start
Before you connect network cables, make sure that the following steps have been completed.
- All your CS systems have been turned on and are acting normally (see Power on the System and Check System Status in Hardware Installation).
- You have read and understood the network architecture in a cluster (see Solution Architecture).
Check Your Host Board Combination
Depending on your host board combination, there are specific ways to connect cables to front-end and internal networks. The new “cross-host board” configurations require firmware v. 142Z12 or later. Refer to the article below for details.
Connect Network Cables
In this section, we use a three-node cluster as an example to demonstrate cluster cabling.
To connect network ports to switches, follow this order: management ports > internal ports > front-end ports.
- Connect management port of each node to a switch.

Important!
Management ports must be connected before deploying the CS cluster; otherwise, it will cause a deployment failure.
- Connect internal ports to another switch.
- Connect the front-end ports to the other switch.
- Front-end connection is not necessary when deploying a cluster. You can always configure it afterwards.
- Out of performance considerations, we recommend connecting front-end ports and internal ports to separate switches. If you connect them to the same switch, ensure to perform zoning on the switch to keep them separated.

Important!
All internal ports must be connected before deploying the CS cluster; otherwise, it will cause a deployment failure.

Note: