We use cookies on this website. To find out more about cookies and how they are used on this website, see our Privacy Policy.
By clicking ‘Continue’, you hereby agree with our use of cookies.

{{vmH.selected.familySearch.replace("EonStor ", "")}} Installation Guide

Installation Guide

Power on the System 

EonStor GS / GS 4000 G3 / GS 4090 G3

Turn on the System

  1. Connect the included power cords to the power sockets of the storage device (A).
  2. Turn on the networking devices.
  3. Turn on the JBOD expansion systems (if applicable).
  4. Press the power button to turn on the storage device (B).

Check System Status

Once you have turned on the storage system, wait for three minutes. Then check the system status with the following LEDs.

Front Panel LEDs

The service LED (1) should be off, while all the other LEDs should be lit in green.

Front Panel LEDs
NumberLED NameNormal Status
ServiceOFF
PowerGreen
Cooling fanGreen
TemperatureGreen
System faultGreen
Mute/Service button--